Meacham RM 10-11 Instream Enhancement and Floodplain Restoration Project

The Meacham RM 10-11 Instream Enhancement and Floodplain Restoration Project aims to improve instream fish habitat, natural processes, and channel morphology, while protecting existing infrastructure along Meacham Creek between RM 9.1 and RM 10.1.

The goals of the Project are to improve instream habitat for Endangered Species Act (ESA) listed and non-listed fish, benefit channel morphology and instream processes, increase floodplain connectivity, and protect existing infrastructure along Meacham Creek. These will be achieved by installing large woody material (LWM), restoring streambanks, off- and side-channels, set-back or removal of existing berms, dikes, and levees; gravel augmentation; road and trail erosion control and decommissioning; noxious weed management and replanting native riparian species. The areal extent of disturbance is 105 acres. Construction began in the summer of 2025 and was completed in the fall of 2025.

Project Lead: CTUIR

Project Collaborators: CTUIR

First Foods this project targets

Water
Salmon
Deer
Roots
Berries

River Vision Touchstones this project targets

Hydrology
Geomorphology
Connectivity
Aquatic Biota
Riparian Vegetation

External Links

Title Links
Meacham River Mile 10 September 2025 Drone Flight


No funders found.



File Library

Title File Description
Meacham Creek RM 10-11 100% Implementation PlanMeacham_Creek_RM_10-11_Implementation_Plan.pdfUploaded file Meacham_Creek_RM_10-11_Implementation_Plan.pdf
Meacham Creek RM 10-11 RFPRFP_Meacham_Ck_RM10-11.pdfUploaded file RFP_Meacham_Ck_RM10-11.pdf
Meacham RM 10-11 RGP-4 PermitMeacham_RM10_RGP-4_Final_permit.pdfUploaded file Meacham_RM10_RGP-4_Final_permit.pdf