UmaBirch Floodplain Restoration and In-stream Enhancement (Project Area-2)
The UmaBirch Floodplain Restoration and In-stream Enhancement project aims to restore fish habitat and improve channel morphology and instream processes in the selected project area, which includes Birch Creek from river mile (RM) 0.0 to RM 0.7 and RM 1.8
The goal of the project is to improve instream habitat for Endangered Species Act (ESA) listed and non-listed fish to reestablish natural channel morphology and instream processes and protect existing infrastructure along both Birch Creek and the Umatilla River. This will be achieved by constructing a new main channel, riparian islands, wetlands, side and off channels, floodplain benching, and terrace fill. Excavation and fill quantities have been designed to balance locally. Imported material includes large woody material (LWM), boulders, and grade stabilization material. LWM structures will be placed in the new channel and across the floodplain. Finally, planting and seeding will be performed by CTUIR and others to initiate revegetation of the site and promote restoration of the riparian community. The areal extent of disturbance is 53.6 acres. Construction is anticipated to begin in the summer of 2026 and be completed in late 2027.
Project Lead: CTUIR
Project Collaborators: Bonneville Power Administration
First Foods this project targets
| Water | |
| Salmon | |
| Deer | |
| Roots | |
| Berries |
River Vision Touchstones this project targets
| Hydrology | |
| Geomorphology | |
| Connectivity | |
| Aquatic Biota | |
| Riparian Vegetation |
No funders found.
File Library
| Title | File | Description |
|---|---|---|
| Section 408 Request #FY19-NO46_100% Design Submittal 7-1-25 | Section408RequestFY19-NO46_100Submittal_7-1-25.pdf | Uploaded file Section408RequestFY19-NO46_100Submittal_7-1-25.pdf |
| UmaBirch PA-2 100% Implementation Plan | UmaBirch_PA2_ImplementationPlan_100Percent.pdf | Uploaded file UmaBirch_PA2_ImplementationPlan_100Percent.pdf |