View and download Images, Reports and Data from this project.
Project files (Reports and Data) are listed first, and then Image files further down.
Project Files
| Title | File | Description |
|---|---|---|
| Final Assessment Report for the Reintroduction of Anadromous Fish in the McKay Creek Drainage within the Umatilla river Subbasin 2017 | McKay Creek reintroduction section.docx | Tetra Tech. 2017. Final Assessment Report for the Reintroduction of Anadromous Fish in the McKay Creek Drainage within the Umatilla river Subbasin 2017. Prepared for CTUIR. |
| Meacham Creek RM 10-11 100% Implementation Plan | Meacham_Creek_RM_10-11_Plan100pct.pdf | Meacham Creek RM 10-11 100% Implementation Plan |
| TERO Code April 2025 | tero-code-thru-4-2025.pdf | CTUIR TERO code |
| The Umatilla River Vision | https://paluut.ctuir.org/services/uploads/P/11047/TheUmatillaRiverVision_JonesEtAl2008.pdf | The Umatilla basin includes a healthy river capable of providing First Foods that sustain the continuity of the Tribe's culture. This vision requires a river that is dynamic, and shaped not only by physical and biological processes, but the interactions and interconnections between those processes. (Jones et. al. 2008) |
| UmaBirch PA-2 Implementation Plan | UmaBirch_PA2_100_Implementation_Plan.pdf | PA-2 Implementation plan for construction |
| UmaBirch PA-2 Levee setback 100% Design Submittal | PA2_Levee_setback_100_Design_Submittal.pdf | |
| UmaBirch PA-3 Implementation Plan | UmaBirch_PA3_100_Implementation_Plan.pdf | PA-3 Implementation Plan for Construction |